HOMEFAQ
ENGINEERING KNOWLEDGE CENTRE | DISCOM & MNRE CERTIFIED

EVERYTHING YOU WANT TO KNOW ABOUT SOLAR

Find clear, engineer-verified answers about rooftop solar installations, DISCOM net-metering protocols, PM Surya Ghar central subsidies, commercial accelerated depreciation, and lifetime preventive AMC.

West Bengal DISCOM Compliant
Real-Time Net-Metering Advisory
MNRE Registered EPC Partner

Need Expert Advice?

CALL US NOW
+91 7001 706 844
24/7 SUPPORT AVAILABLE
Under 2 Hours
QUICK REPOSITORY LOOKUP

How Can We Help You Today?

Type any solar engineering keyword, scheme, or billing metric to filter questions instantly.

Trending Queries:
FREQUENTLY CONSULTED

Popular Questions

Verified by A2S Senior Engineering Lead • West Bengal & Assam Operational Footprint
A grid-tied rooftop solar system generates electricity from the sun during the day and feeds it directly into your building's electrical panel. Any excess power is exported to the DISCOM grid via a bi-directional net meter.
A properly sized solar plant can reduce your electricity bill by 80% to 100%. The exact savings depend on your roof space, current tariff slab, and daily consumption patterns.
Typically, you need about 80 to 100 square feet of shadow-free roof space for every 1 kW of solar panel installation using modern high-efficiency mono PERC modules.
Under the PM Surya Ghar scheme, residential consumers can receive a maximum central financial assistance (subsidy) of ₹78,000 for a system size of 3 kW or above.
A standard residential installation takes 2-4 weeks. The physical panel installation takes only 2-3 days, but DISCOM net-metering approvals and CEIG clearances make up the rest of the timeline.
Standard grid-tied systems shut down during power cuts for safety reasons (anti-islanding) to protect grid workers. To have power during outages, you would need a Hybrid solar system with battery storage.
HOME ROOFTOP SYSTEMS

Residential Solar FAQ

Tailored for independent villas, residential societies, and duplex properties across North Bengal.

Most RCC (concrete) roofs and sturdy metal sheds in North Bengal are highly suitable. Our engineers conduct a free site survey to assess structural integrity, shadow-free area, and optimal orientation for maximum generation.
A standard 3kW system generates around 12-15 units per day, while a 5kW system generates about 20-25 units per day on average, depending on the season and weather conditions.
Solar panels still generate electricity on cloudy or rainy days, though at a reduced efficiency (typically 30-50% of peak capacity). Thanks to net-metering, the surplus units you generated during sunny months cover your monsoon shortfall.
Yes, absolutely. A grid-tied solar system acts in parallel with the DISCOM grid. During the day, your heavy loads run primarily on solar power. If your loads demand more power than the panels generate, the grid seamlessly makes up the difference.
We offer end-to-end liaisoning. From initial feasibility study submissions to CEIG inspections and the final bi-directional meter installation by WBSEDCL, our dedicated team handles all the paperwork and local utility coordination for you.
Cooch Behar Luxury Residence
Commissioned Project

Cooch Behar Luxury Residence

7.2 kWp Tier-1 Bifacial PV Array • Net-Metered

Residential System Specifications

Panel Warranty25 Years Linear
Inverter Warranty5 to 10 Years
Expected Payback3.2 - 4.5 Years
Govt Direct SubsidyUp to ₹78,000
Technovate Corporate Park
Enterprise EPC

Technovate Corporate Park

350 kWp Commercial Rooftop Array

Commercial CAPEX vs. OPEX

Commercial enterprises realize rapid break-evens by monetizing idle rooftop space while claiming accelerated corporate tax depreciation.

Section 32 Tax Shield40% AD Benefit
Levelized Cost of Energy (LCOE)₹2.80 - ₹3.40 / unit
ENTERPRISE & INSTITUTIONS

Commercial Solar FAQ

Comprehensive engineering solutions for hospitals, colleges, cold storages, tea gardens, and office buildings.

We perform a detailed load analysis using your 12-month electricity bills, assess peak demand, and map your shadow-free roof area. The optimal capacity is designed to maximize your ROI without exceeding the sanctioned load limits set by the DISCOM.
Under Section 32 of the Income Tax Act, businesses can claim up to 40% depreciation on solar plants in the first year itself. This drastically reduces your taxable income, effectively allowing the government to indirectly subsidize your CAPEX.
No. For industrial metal roofs (trapezoidal or standing seam), we use non-penetrative aluminum clamps. For flat RCC roofs, we use chemical anchors sealed with industrial-grade waterproofing epoxies to guarantee zero leakage.
Every commercial plant includes enterprise-grade data loggers that transmit string-level telemetry to a cloud dashboard. You can monitor daily generation, PR (Performance Ratio), and carbon offset metrics in real-time on your phone or desktop.
HIGH TENSION (HT) & MEGAWATT SCALE

Industrial Solar Engineering FAQ

Engineered for manufacturing facilities, steel mills, cement hubs, rice mills, and industrial sheds across Eastern India.

Yes, our EPC division specializes in MW-scale industrial projects. We handle everything from HT side grid-integration and large-scale DC cable sizing to transformer upgrades and CEIG approvals for heavy industries.
Before any industrial installation, our civil engineers use STAAD-Pro software to model your factory shed. We analyze dead loads, live loads, and wind loads (up to 200km/h) to ensure your pre-engineered building (PEB) can safely support the solar array for 25 years.
We design and install custom LT/HT panels, vacuum circuit breakers (VCBs), and step-up transformers to seamlessly synchronize the solar plant's output with your existing 11kV or 33kV high-tension grid infrastructure.
Our tier-1 commercial inverters feature advanced reactive power control and active harmonic filtering. We ensure total harmonic distortion (THD) remains below 3% and the power factor is maintained near unity to avoid DISCOM penalties.
END-TO-END DELIVERY

Turnkey Solar EPC Framework

How our integrated Engineering, Procurement, and Construction model guarantees project bankability and zero execution risk.

E

Engineering

Precision Design & Simulations
Drone topographic terrain mapping
PVSyst generation forecasting
STAAD structural safety certifications
P

Procurement

Direct Tier-1 Supply Chains
Tier-1 ALMM listed bifacial modules
German/Austrian engineering inverters
Hot-dip galvanized mounting structures
C

Construction

Statutory Liaison & Grid Sync
CEIG statutory safety approvals
Zero-accident HSE site supervision
DISCOM net-meter commissioning
Turnkey EPC means we take complete, single-point responsibility for the entire project from concept to commissioning. You don't need to hire separate vendors for panels, installation, or DISCOM liaisoning. We hand over a fully operational, grid-synchronized plant.
Yes, our dedicated in-house liaisoning team manages the entire bureaucratic process. This includes feasibility approvals, net-metering agreements with WBSEDCL/CESC, and mandatory electrical safety clearances from the Chief Electrical Inspector to Government (CEIG).
We sign legally binding commercial EPC contracts that include strict execution timelines. If project commissioning is delayed due to our execution (excluding Force Majeure or DISCOM delays), we adhere to standard Liquidated Damages (LD) clauses to protect your investment.
PREVENTIVE OPERATIONS & MAINTENANCE

Annual Maintenance Contracts (AMC)

View Detailed AMC Packages
Dust, bird droppings, and industrial smog can reduce solar generation by up to 20-30%. Structured AMC ensures monthly chemical-free cleaning, torque tightening, and electrical health checks to maintain peak PR (Performance Ratio).
Regular tap or borewell water contains dissolved salts and minerals (like calcium). When water evaporates off hot solar panels, it leaves behind a hard white scale (calcification) that permanently damages the anti-reflective coating. We exclusively use RO demineralized water.
Yes, for our MW-scale and premium commercial AMC clients, we conduct biannual drone thermography inspections using thermal imaging to detect micro-cracks, diode failures, and PID (Potential Induced Degradation) before they affect generation.
Yes. Our O&M division provides 3rd-party takeover services. We begin with a comprehensive plant health audit, recalibrate the inverters, repair any existing faults, and then transition the plant onto our standard AMC protocols.
MNRE Central Financial Assistance

PM Surya Ghar: Muft Bijli Yojana

Everything you need to know regarding application steps, eligibility guidelines, Direct Benefit Transfer (DBT), and direct financial subsidies up to ₹78,000.

₹78,000Max Direct DBT Subsidy
It is a central government scheme providing financial assistance for residential solar. The current slabs are: ₹30,000 for 1kW, ₹60,000 for 2kW, and a maximum of ₹78,000 for systems of 3kW and above.
Any residential electricity consumer with a valid electricity bill in their name and an RCC roof or structurally sound shed can apply. Commercial, industrial, and institutional consumers are not eligible for this specific subsidy.
You will need a recent electricity bill (under 6 months old), the applicant's Aadhar card, PAN card, a passport-sized photograph, a cancelled cheque for the DBT transfer, and the latest property tax receipt.
Yes, we handle the entire process from start to finish. From creating your profile on the National Portal (pmsuryaghar.gov.in) to submitting project completion reports and facilitating the final CEIG inspection for your DBT release.

Official Advisory: All government subsidies and central financial assistance are subject to prevailing MNRE guidelines, DISCOM quota approvals, and portal fund release timelines.

RETURN ON INVESTMENT

Solar Cost, Savings & Financial Payback

Clear economic math detailing initial capital investment, annual electricity savings, and amortized returns.

The benchmark cost typically ranges from ₹45,000 to ₹60,000 per kW, depending on the scale (residential vs. commercial), technology (Mono PERC vs. Bifacial), and structure height. Government subsidies will further reduce your net out-of-pocket investment.
For residential clients benefiting from the PM Surya Ghar subsidy, the payback period is typically 3 to 4 years. For commercial entities claiming Accelerated Depreciation (AD) benefits, break-even often occurs in just 2.5 to 3.5 years.
Electricity tariffs historically rise by 3-5% annually. When you install solar, you lock in your cost of power at near-zero for 25 years. As grid tariffs increase, your relative financial savings grow exponentially each year, pushing your lifetime ROI higher.
We provide highly accurate generation estimates using PVSyst simulations based on 20-year meteorological data for your specific GPS coordinates. While weather fluctuates daily, the annualized generation yield is highly predictable and bankable.
ACCURATE FINANCIAL SIMULATION

Want an exact financial simulation for your property?

Input your monthly electric bill amount to calculate required capacity, net investment after PM Surya Ghar subsidy, and projected 25-year lifetime savings.

6-STEP COMMISSIONING JOURNEY

Installation Workflow & Protection

Our standardized turnkey procedure from engineering site survey to active net-meter grid export.

1

Site Audit

Shadow path & structural test

2

3D Modeling

Electrical SLD & DPR design

3

DISCOM Sanction

Portal approvals & token

4

Mounting & BOS

HDG structure & Tier-1 panels

5

Safety & Earthing

Copper pits & arrestors

6

Sync & DBT

Bi-directional meter activation

Every installation includes a dedicated copper Lightning Arrestor (LA) mounted above the panels, along with separate chemical earthing pits for the DC structures and AC inverters. We also install heavy-duty DC and AC Surge Protection Devices (SPDs) to shield against grid voltage spikes.
Upon commissioning, we set up a dedicated Wi-Fi data logger connected to your inverter. You receive login credentials for a mobile app (iOS/Android) where you can track real-time generation, historical yield graphs, environmental offsets, and system health alerts 24/7.
Senior Solar Engineers reviewing plans
DIRECT TECHNICAL ADVISORY

Can't Find What You're Looking For?

Solar regulations, DISCOM rules, and roof structures differ for every property. Our senior solar engineers in Cooch Behar are available to answer your specific technical, financial, or net-metering queries.

Response Time: < 2 Hours
•
Direct: 7001 706 844
START YOUR CLEAN ENERGY TRANSITION

HAVE A SOLAR PROJECT QUESTION FOR YOUR FACILITY?

Schedule a complimentary technical roof audit, 3D shadow analysis, and financial DPR tailored to your electricity tariff structure.